Vehicle Detail
2022 BMW M4 Competition xDrive
2022 BMW M4 Competition xDrive
Mileage 9,884
Style 2Dr. Coupe
Trans Automatic
Exterior Sao Paulo Yellow
Interior Fjord Blue – Black
VIN# WBS43AZ09NCK14839
Stock# NCK14839
Model Code 22DC
Features
Specs
Std. Equip.
harman/kardon Surround Sound System
Radio w/Seek-Scan; Clock; Speed Compensated Volume Control; Steering Wheel Controls; Voice Activation; Radio Data System; External Memory Control and 20 Gb Internal Memory
2 LCD Monitors In The Front
Radio: AM/FM Audio System -inc: Apple CarPlay & Android Auto Compatibility
Streaming Audio
Integrated Roof Antenna
600w Premium Amplifier
16 Speakers
Artti Real-Time Traffic Display
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Wheels: 19 x 9.5 Fr/20 x 10.5 Rr (Style 826M) -inc: M double-spoke bi-color
Clearcoat Paint
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Fixed Rear Window w/Defroster
LED Brakelights
Body-Colored Front Bumper
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Galvanized Steel/Aluminum/Composite Panels
Tire Mobility Kit
Rocker Panel Extensions
Body-Colored Door Handles
Black Grille
Headlights-Automatic Highbeams
Perimeter/Approach Lights
Trunk Rear Cargo Access
Tires: 275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
Black Power Heated Side Mirrors w/Driver Auto Dimming; Power Folding and Turn Signal Indicator
Light Tinted Glass
Front License Plate Bracket
Lip Spoiler
Power Door Locks w/Autolock Feature
Trip Computer
Enhanced Bluetooth
Systems Monitor
3 12V DC Power Outlets
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination; Driver And Passenger Auxiliary Mirror
ConnectedDrive Services
HVAC -inc: Underseat Ducts and Console Ducts
Fixed Rear Windows
Full Cloth Headliner
Delayed Accessory Power
Power Front Seats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Perimeter Alarm
M Sport Seats -inc: Heated Front Seats
Outside Temp Gauge
Manual Tilt/Telescoping Steering Column
Full Floor Console w/Covered Storage; Mini Overhead Console and 3 12V DC Power Outlets
Garage Door Transmitter
BMW Assist eCall
Cargo Features -inc: Tire Mobility Kit
Proximity Key For Doors And Push Button Start
Cargo Area Concealed Storage
Valet Function
Immobilizer
Sport Leather/Metal-Look Steering Wheel
Cruise Control w/Steering Wheel Controls
Gauges -inc: Speedometer; Odometer; Engine Coolant Temp; Tachometer; Trip Odometer and Trip Computer
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert and Metal-Look Interior Accents
Redundant Digital Speedometer
Rear Cupholder
Day-Night Auto-Dimming Rearview Mirror
Leather/Metal-Look Gear Shifter Material
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Extended Merino Leather Upholstery
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Illuminated Locking Glove Box
2-Way Power Passenger Seat -inc: Power Seatback Side Bolster Support; Manual Cushion Extension and Power Rear Seat Easy Entry
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
BMW TeleServices
Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
Air Filtration
2-Way Power Driver Seat -inc: Power Seatback Side Bolster Support; Manual Cushion Extension and Power Rear Seat Easy Entry
Power Fuel Flap Locking Type
Instrument Panel Covered Bin; Driver And Passenger Door Bins
FOB Controls -inc: Cargo Access and Windows
Live Cockpit Pro w/Navi
Lumbar Support
Front Center Armrest and Rear Center Armrest
Leatherette Door Trim Insert
Compass
Front Cupholder
Dual Zone Front Automatic Air Conditioning
Smart Device Integration
Tracker System
Driver And Passenger Heated-Cushion; Driver And Passenger Heated-Seatback
Rear HVAC w/Separate Controls
Memory Settings -inc: Driver Seat and Door Mirrors
Remote Keyless Entry w/Integrated Key Transmitter; 2 Door Curb/Courtesy; Illuminated Entry; Illuminated Ignition Switch and Panic Button
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Cargo Space Lights
Front And Rear Anti-Roll Bars
3.15 Axle Ratio
4-Wheel Disc Brakes w/4-Wheel ABS; Front And Rear Vented Discs; Brake Assist; Hill Hold Control and Electric Parking Brake
Full-Time All-Wheel
Electric Power-Assist Speed-Sensing Steering
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Gas-Pressurized Shock Absorbers
Electro-Mechanical Limited Slip Differential
Engine: 3.0L 6-Cylinder TwinPower Turbo
Regenerative Alternator
Strut Front Suspension w/Coil Springs
Engine Oil Cooler
Transmission: 8-Speed STEPTRONIC Automatic
70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
Multi-Link Rear Suspension w/Coil Springs
15.6 Gal. Fuel Tank
Transmission w/Driver Selectable Mode and Oil Cooler
Engine Auto Stop-Start Feature
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Tire Specific Low Tire Pressure Warning
Curtain 1st And 2nd Row Airbags
Lane Departure Warning
Back-Up Camera
ABS And Driveline Traction Control
DSC Electronic Stability Control (ESC)
Collision Mitigation-Rear
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Driver Monitoring-Alert
Forward Collision Mitigation
Side Impact Beams
Blind Spot Detection Blind Spot
Dual Stage Driver And Passenger Front Airbags
Airbag Occupancy Sensor
Collision Mitigation-Front
Driver And Passenger Knee Airbag
Park Distance Control Front And Re
- Vehicle Location